Allcott 2015 - Site Selection Bias in Program Evaluation

Routing Summary

This folder fully captures Allcott (2015), Site Selection Bias in Program Evaluation (Quarterly Journal of Economics 130(3); NBER WP 18373, revised Sept. 2014 — the captured PDF): the formal model of external validity and site selection bias, motivating evidence from microfinance and clinical trials, the Opower setting (111 RCTs, 8.6M households), extrapolation from first-ten-site microdata that overpredicts later sites by about 0.5 pp, the metadata decomposition of selection mechanisms, and the design-based remedies. The online appendices (A-D, pp. 44-73 of the PDF) are referenced but not transcribed.

Concept Map

ConceptNoteTypeDepends OnKey Result
Selection of RCT partners on observablesAllcott 2015 - Motivating Evidence from Microfinance and Clinical Trialsexamplenonepartners differ on 6 of 8 MFI traits; F-tests reject
External unconfoundedness / overlapAllcott 2015 - Model of External Validity and Site Selection BiasdefinitionRubin causal modelAssumptions 3-4 enable eq. (1)
Transport of the ATEAllcott 2015 - Model of External Validity and Site Selection BiastheoremAssumptions 1-4target ATE = sample CATE averaged over target X
Site; Assumption 3A; Assumption 3BAllcott 2015 - Model of External Validity and Site Selection Biasdefinitionexternal unconfoundedness3B weaker than 3A
Site selection biasAllcott 2015 - Model of External Validity and Site Selection Biasdefinition3Bfails unless sites randomly selected
Five selection mechanismsAllcott 2015 - Opower Program, Selection Mechanisms and DataconceptOpower settingusage, preferences, programmes, size, ownership
Dispersion of site effectsAllcott 2015 - Opower Program, Selection Mechanisms and DataexamplemetadataQ p<0.001; 3.62B range
Heterogeneous effects regressionAllcott 2015 - Microdata Extrapolation and the Prediction Failuredefinitionmicrodataelectric heat +1.2 pp, first comparison +0.09 pp/kWh
Linear prediction; reweightingAllcott 2015 - Microdata Extrapolation and the Prediction FailuredefinitionAssumptions 5-6national prediction ~1.7%
In-sample prediction failureAllcott 2015 - Microdata Extrapolation and the Prediction Failuretheoremaboveoverpredicts later sites by 0.64 / 0.40 pp
Cohort and within-utility trendsAllcott 2015 - Metadata Analysis of Site Selection Mechanismstheoremmetadata-0.173 pp/year; -0.091 pp per next site
Utility-level selectionAllcott 2015 - Metadata Analysis of Site Selection MechanismstheoremZ_u variablespreferences positive; IOU negative
Nationwide predictionAllcott 2015 - Metadata Analysis of Site Selection Mechanismsexampleeq. (8)1.80B
Design-based remediesAllcott 2015 - Conclusions, Remedies and Marketing Implicationsconceptall aboverandomise sites within strata

Notes

Sources

  • Allcott 2015 - Site Selection Bias in Program Evaluation — Allcott H (2015), QJE 130(3); NBER Working Paper 18373 (rev. Sept. 2014), 73 pp. including appendices.

See Also